stream crossing design & installation

Client: Tilton Pond Watershed
Location: Maine
Performed a hydrologic evaluation of the stream watershed and engineered measures to prevent chronic flooding damage. Engineered sizing and installation of two culverts, stabilized existing overflow lip to prevent continued road shoulder washouts.
